Back to Resource Library
WorksheetConstruction and FacilitiesVersion 1.0 Reviewed 10/1/2026

Job Hazard Analysis Worksheet

A step-by-step worksheet for breaking a task into stages, identifying hazards at each stage, and recording the controls before work begins.

Wise DSP · Wise Decisions, Solutions, and Planning, LLC

A job hazard analysis is only useful if the crew that does the work helps write it. Complete one worksheet per task type, walk the actual work area, and update it whenever the tools, materials, or site conditions change.

This worksheet supports a safety program; it does not replace a qualified safety professional, site-specific training, or the requirements that apply to your work.

What's included

  • Task breakdown by step
  • Hazard and consequence fields
  • Control hierarchy prompts
  • PPE and permit checks
  • Crew review and sign-off

Header

  • Task being analyzed:
  • Location or site:
  • Date:
  • Prepared by:
  • Crew members consulted:
  • Required permits:

Step 1 — Break the task into stages

List the task in order, one action per line. Keep it to the major stages — usually five to ten.

Step 2 — Identify hazards at each stage

For each stage, ask: what could injure someone here, and what could go wrong with the equipment or the environment?

| Stage | Hazard | Who could be harmed | | --- | --- | --- | | | | |

Step 3 — Choose controls, strongest first

Work down this list and stop at the first control that genuinely removes or reduces the risk.

  1. Eliminate the step or the hazard.
  2. Substitute a safer material, tool, or method.
  3. Engineer a guard, barrier, ventilation, or lift assist.
  4. Administrate with procedure, scheduling, signage, or training.
  5. Protect with personal protective equipment as the last line.

Record the control and who is responsible for it being in place.

Step 4 — Confirm readiness

☐ Required permits obtained and on site ☐ Equipment inspected and guards in place ☐ Utilities identified and isolated where required ☐ Emergency contacts and nearest medical facility known ☐ Communication method agreed for the crew ☐ Stop-work authority understood by everyone present

Step 5 — Crew review and sign-off

Read the completed worksheet aloud with the crew before work starts. Anyone may add a hazard.

| Name | Role | Signature | Date | | --- | --- | --- | --- | | | | | |

Step 6 — Review after the job

Within a week of completion, note anything that was not anticipated, anything that was harder than expected, and the change you will make to this worksheet. Re-issue the worksheet with a new date.

Construction and FacilitiesLogistics and Supply Chainsafetyrisk assessmentfield operationstraining

Document approval statement

Approved — published by the Wise DSP Command Plane

Owner: Zeus Wise — Senior Agent / Owner
Authority: Wise DSP Command Plane
Version: 1.0
Approved: 2026-10-29 at 05:32 UTC

This document is approved for publication by the Wise DSP Command Plane. Document owner of record: Zeus Wise, Senior Agent / Owner. Version 1.0. Any change to its content requires re-approval before it is published again.

Published free by Wise DSP through SunArrow. Use and adapt these tools for your own business. Nothing here is legal, tax, or accounting advice — confirm requirements that apply to your business with a qualified professional.